§ 16-4-203. Requirements in addition to the minimum control requirements.  


Latest version.
  • The approving authority may require more than the minimum control requirements specified in this subtitle if:
    (1) hydrologic or topographic conditions warrant;
    (2) flooding, stream channel erosion, or water quality problems exist between the site outfall and the designated point of investigation; or
    (3) the County has completed a watershed management study that indicates that additional requirements are necessary.
    (Bill No. 58-10)