§ 18-2-303. Exemptions to bulk regulations.  


Latest version.
  • In-kind replacement is exempt from applicable bulk regulations if:
    (1) the original structure has been in the same location for at least twenty years; and
    (2) a building permit is obtained within eighteen months after the removal or destruction of the original structure.
    (Bill No. 3-17)